|
Logbook Entries - 1999
|
Date 1999 |
Location | (Chronological Order) |
Apr 7th | Branford | Fairclough Sailmaker removed cover |
Apr 10th Apr 11th |
Branford | Perfect Weekend. Sanded bottom to install new bottom paint (Micron). I only sanded because I was not sure what type of paint the dealer used. Waxed the sides and she was ready.
|
Apr 16th | Branford | Launched in the rain. Only one little problem was Seacock for the engine intake leaked. The leak stop the next day once the wood around the seacock swelled up. De-winterized boat without any problems.
|